Tile work, done eventually

Slow as molasses. Sweet when it's done.

Backsplashes, floors and showers, laid one careful tile at a time. Sometimes one tile per weekend. Estimated completion date: yes.

Now accepting zero new projects. Current project ETA: soon-ish.

What is Molasses Tile?

Founded one weekend that somehow became several, Molasses Tile has grown from one person with a wet saw into a thriving enterprise of one person with a wet saw. Our loyal client base (relatives, plus friends who made the mistake of saying "that looks nice") enjoys industry-leading wait times and a 100% eventual completion rate.

I'm not a contractor, and I'm definitely not fast. But I measure carefully, I pull up the tiles that aren't right, and every job I've started has been finished. Eventually.

How a Molasses Tile job goes

  1. You ask

    Usually over dinner. Somebody mentions a backsplash and I hear myself say "I could do that."

  2. I plan. A lot.

    Layouts get sketched, redrawn and argued over. Thinset gets mixed in small batches, because this is going to take a while.

  3. Tile goes down

    One row at a time, with spacers, levelers and a lot of checking. Any tile that isn't right comes back up.

  4. Grout, then gloat

    Grout, seal, wipe the haze, step back. Then a long admiring pause, which also takes a while.

By the numbers

All
jobs finished
None
jobs finished early
Lost count
tiles re-cut
Plenty
patience required

Got a tiling story of your own?

Tell me how long your backsplash took. I promise mine took longer. (No, I'm not taking on jobs. I'm still finishing the last one.)

Get in touch