Tile work, done eventually
Slow as molasses. Sweet when it's done.
Backsplashes, floors and showers, laid one careful tile at a time. Sometimes one tile per weekend. Estimated completion date: yes.
Now accepting zero new projects. Current project ETA: soon-ish.
What is Molasses Tile?
Founded one weekend that somehow became several, Molasses Tile has grown from one person with a wet saw into a thriving enterprise of one person with a wet saw. Our loyal client base (relatives, plus friends who made the mistake of saying "that looks nice") enjoys industry-leading wait times and a 100% eventual completion rate.
I'm not a contractor, and I'm definitely not fast. But I measure carefully, I pull up the tiles that aren't right, and every job I've started has been finished. Eventually.
How a Molasses Tile job goes
You ask
Usually over dinner. Somebody mentions a backsplash and I hear myself say "I could do that."
I plan. A lot.
Layouts get sketched, redrawn and argued over. Thinset gets mixed in small batches, because this is going to take a while.
Tile goes down
One row at a time, with spacers, levelers and a lot of checking. Any tile that isn't right comes back up.
Grout, then gloat
Grout, seal, wipe the haze, step back. Then a long admiring pause, which also takes a while.
By the numbers
- All
- jobs finished
- None
- jobs finished early
- Lost count
- tiles re-cut
- Plenty
- patience required
Got a tiling story of your own?
Tell me how long your backsplash took. I promise mine took longer. (No, I'm not taking on jobs. I'm still finishing the last one.)
Get in touch